DAR MEMORANDUM CIRCULAR NO. 04-11

 

SUBJECT    :     Implementing Guidelines to Access Funds, Implement and Monitor Projects under the DAR-PBD Partnership Support Fund

 

I.          Purpose/Rationale/Background

Republic Act 9700, or the CARPER, affirms the mandate of the Department of Agrarian Reform (DAR) to complete its Land Acquisition and Distribution (LAD) target and provide sufficient and appropriate support services to the farmer-beneficiaries, through the Program Beneficiaries Development (PBD).    CDAcIT

Towards this end, RA 9700 hopes to implement an integrated of land tenure improvement (LTI) and program beneficiaries development (PBD) strategy to ensure that support services interventions are made available to potential/identified farmer-beneficiaries appropriate to their needs, at any given time within the pre and post coverage of the CARP-covered land/s. DAR Administrative Order No. 05, Series of 2010, details the Implementing Rules and Regulations (IRR) for Support Services, particularly the interface between LTI and PBD.

Consistent with the Integrated Area Development (IAD) approach previously and presently adopted by the Department to define area-specific and demand-driven programs, the management required the DAR provincial offices to define their PBD priorities and needs depending on such peculiarities as: a) tenurial security, b) development maturity of ARB organizations, c) available crops, d) market opportunities and e) presence of convergence partners. Thus, Memorandum No. 292 series of 2010, as further clarified by Memorandum No. 64 Series of 2011, were issued and promulgated, which required the DARPOs to formulate and submit their pilot models for PBD.

For its part, the DAR Support Services Office (DAR-SSO) have allocated funds for proposed projects, within the pilot models and included in the provincial plans, that would primarily impact on the ARBs' quality of life, through increased income and improved farm productivity.    DcICEa

Thus, this Circular prescribes the guidelines on accessing PBD support fund and adopt a standard format on project proposal and appraisal templates that will "projectize" PBD.

II.        Coverage

The rules and procedures under these Memorandum Circular apply to all PBD "soft" 1 projects and programs of the Department proposed for funding under FAPs/ODA and/or ARF/Non-FAPs.

III.       Guiding Principles

The following are the guiding principles of this Memorandum Circular:

           The projects should start with "the end in mind". It must be geared towards development results and impacts.

           Projects are to be considered as joint undertaking or partnership between and among the DAR, and the proponent and the project beneficiaries, hence cost and/or equity sharing among the project stakeholders to implement PBD projects is a must.

           Appraisal and approval are based on merits of each project proposal.

           Due to limited available funds, project approval will be a competitive process. Project approval shall be based on the PBD and LTI realities of the provinces, and the provincial PBD priorities as agreed between the DAR Executive Committee and DARPO.

           The DAR is not a funding agency and as such, these templates will not be announced and there will be no open "call for proposals."

IV.       Eligibility Requirement and Criteria

a)         For Project Proponents

Groups eligible to access the DAR-PBD Partnership Support Fund are:

           DAR field offices, (DARROs/DARPOs/DARMOs);

           LGUs, priority to be given to 5th and 6th class municipalities;

           Non-Government Organizations (NGOs);    CSHEAI

           Academic institutions;

           Business development service (BDS) providers; and

           Peoples' organizations (POs) and ARB cooperatives, among others.

To qualify, NGOs, BDS providers, academic institutions, POs, and cooperatives should:

1.         Be registered and/or accredited with Security and Exchange Commission, Cooperative Development Agency, DOLE-Bureau of Workers with Special Concerns (BWSC);

2.         Show proof of having implemented/managed projects successfully, regardless if these are similar or not in nature and complexity to their proposed project;

3.         Submit authenticated copy of their Constitution and by-laws;

4.         Submit Audited financial statements, showing among others, the organization's total current assets and liabilities, stamped "received" by the BIR or its duly accredited and authorized institution, for the preceding calendar year which should not be earlier than three (3) years from the date of submission of project proposal and;

5.         Submit a sworn affidavit of the Secretary of the NGO/PO that none of its incorporators, organizers, director or officials is an agent of or related by consanguinity or affinity up to the fourth civil degree to the officials of the DAR authorized to process and/or approve proposal, the MOA and the release of funds;

6.         Proponents should not have unliquidated obligations from DAR.

b)        For Projects

Projects proposed for funding should subscribe to the current PBD priorities of enterprise development (see attached Annex D) and providing access to social, health and water and sanitation services, among others. Project proposals may be on any of the following Support Services Office (SSO) programs (attached as Annex D), as stated in Memorandum No. 64, Series of 2011, to wit:    DHIcET

1.         Agricultural Productivity Development for existing and new ARBs;

2.         Agri-based Micro-Small and Medium Enterprise (MSME) Development;

3.         Agri-based Industry Development (value-chain approach);

4.         Value-chain Financing Development;

5.         ARB Market Development;

6.         Value-chain and Agri-business Capability Development for ARBs; and,

7.         Enterprise-based capacity enhancement for PBD implementers.

Proposed projects should stipulate a counterpart share in the cost of at least 30% of the total project cost. These may be in the form of labor, materials or equipment, facilities, etc. The counterpart can be shared by the proponent and beneficiary organization and other stakeholders, such as other government agencies, LGUs and/or the private sector. However, the proponent and beneficiary organization should provide for at least 15% of the total project cost.

V.        Procedures for Project Proposal and Appraisal

To facilitate the work of both the proponent partner/organizations as well as the DAR personnel, templates for project appraisal and evaluation were designed. Three templates can be used — for project proposal, desk appraisal and project accomplishment report — these were formulated in keeping with the project development cycle of project design application, appraisal, approval, implementation, accomplishment reporting, monitoring and evaluation, financial auditing and completion.

A.        Project Proposal

A project proposal, based on the DAR-SSO Project Proposal Format (attached as Annex A) is the main document that the project proponent shall submit to the concerned DARPO/DARRO. The proposal should contain the following data/information:

a)         Project Identifying Data

b)        Proponent Organization Identifying Data

c)         Beneficiary Organization Identifying Data    SaHIEA

d)        Collaborating Organization Identifying Data

e)         Project Description (include logframe analysis)

f)         Project Management

g)         Financial and Economic Soundness

h)        Monitoring, Evaluation and Risk Assessment

i)         Sustainability Mechanisms

j)         Community Participation

k)        Promotion of Gender Equality

l)         Promotion of Sound Environmental Practices

m)       Funding Request

n)        Work Plan

o)        Target Major Final Outputs

A Logical Framework Analysis (LFA) should form part of the Project Description (a sample LFA is attached as Annex E).

The template for the Project Proposal is to be answered and followed by all organizations including DARPO and DARRO requesting for "soft projects" funding support.

The proposed project should subscribe to the DAR priorities and should consider DAR provincial plans agreed with the DAR Executive Committee. It presents the activity design intended for implementation. It is the first step in the activity preparation process and includes background information and analysis to support the design. It also provides performance indicators and measures. The questions in the templates should be answered completely. As such, the project proponent must closely observe the format and address the guidelines.

B.        Project Appraisal and Approval (to be accomplished by DAR units only)

B.1      Project Appraisal

The Project Appraisal template (see as Annex B) is the instrument that will be used by the DAR to evaluate the project proposals submitted. The DAR shall score the project proposal to assess its suitability for funding support.    HCETDS

a.         Projects proposed by DARPOs

For project proposed by the DARPO the initial appraisal is done by the DARRO through the RSSD. If the appraisal is positive, the project proposal is endorsed to the regional DAR Executive Committee composed of RD, ARDO, ARDA and CARPOs. If the DARRO Executive Committee approves it, the project proposal is subsequently recommended to the DARCO-SSO for approval.

b.         Projects proposed by provincial local partners

LGUs especially 5th and 6th class municipalities, non-government organizations (NGOs), academic institutions, Business Development Service (BDS) providers, and Peoples' Organizations (POs) and cooperatives may access partnership support fund from the DAR. The partner-proponent shall submit project proposal to the DARPO.

The DARPO through the BDCD shall ensure that the proponent has complied with the eligibility requirements. The BDCD shall review the completeness of documents and validate whether or not the project beneficiaries are ARBs. When the project proposal is in order, the PARO shall submit the document to the DARRO for appraisal and subsequently endorse to the DARCO-SSO for approval.

c.         Projects proposed by DARROs and Proponents with region-wide coverage

Proposal submitted by the DARROs and proponents with region-wide coverage shall be appraised by the DARCO-SSO through the BARBD, PDMS, FAPs unit concern and SSO. The respective appraising unit shall endorse the proposed project for approval to the Undersecretary for Support Services Offices/Project Implementation Office.

d.         Projects proposed by national partners

Non-government organizations (NGOs), academic institutions, business development service (BDS) providers, and peoples' organizations (POs) proposing project catering to various regions but within its operational coverage shall submit their project proposal (using Annex A) to DARCO through SSO.

The SSO shall forward the proposal to the concerned DARCO unit (BARBD, PDMS, FAPs Unit or SSO staff) for appraisal, which findings shall then be presented to the SSO Executive Committee and subsequently endorse for approval to the Undersecretary for SSO/PIO.    AECacS

B.2      Process of project appraisal and approval

Upon receipt of a complete project proposal, the assigned DARRO/BARBD/PDMS/SSO staff reviews the proposal using the Desk Appraisal Form for Project Proposals. Using the nine criteria which coincides with the Proposal format, the project officer assigns a value for each item, with 3 as Very Good, 2 as Good, 1 as Satisfactory and 0 Unsatisfactory. Projects which garner at least 22 points out of the possible 27 points are deemed eligible and subject to further project development. Projects which receive 15 to 21 points qualify for further development while projects with a score of 8 to 14 points are not prioritized and those which have a score of 0 to 7 points are rejected. Project proposals which do not pass the DAR review are immediately returned to the proponents.

For the project proposals that go to the next level of project development, the DARRO/RSSD shall discuss with the project proponent as to how to further improve the proposal. Site appraisal by DARRO/RSSD for proposal submitted/forwarded by DARPO follows. Aside from meeting the proponents, the DARRO/RSSD shall discuss the proposal with the project stakeholders and beneficiaries, and the proponent organization's Board of Directors (BOD). Further validation and improvement of the original project proposals shall be done.

Proposals submitted by DARROs and national partners to DARCO shall undergo the same process as discussed above, which shall be carried out by the appropriate office doing the appraisal.

The revised project document should include the revised Work and Financial Plan (WFP) detailing the schedule of project activities, target outputs, and corresponding budgetary requirements. For non-DAR proponent, a BOD Resolution owning and taking responsibility for the project being proposed shall also be required. The final proposal shall be endorsed by DARRO/RSSD to the DAR Regional Executive Committee for deliberations it recommends the proposal to DAR-SSO/PIO for approval.

If the project proposal gets a negative rating it does not go to the next level. The evaluating DAR unit can either reject the proposal or ask the project proponent to make changes. When the project is approved, the DARCO-SSO shall sub-allocate the budget and program the releases of funds.

Approved project shall be covered with a Memorandum of Agreement and all pertinent government rules and procedures (e.g., Procurement Act, COA rules, and etc.) shall apply. Any violation of the terms of the MOA like fund diversion shall be ground for project termination. The DARCO shall be the signing party for national partnerships and the DARROs for local engagements. No signing of MOA at the regional level shall be undertaken unless the notice of approval has been issued by the Undersecretary for Support Services.    CaSHAc

For project proposals submitted, at different levels, which are to be funded under ODA (Fund 102), the approval and forging of MOA shall be in accordance with the policy and procedures prescribed by specific foreign-assisted project.

C.        Project Implementation and Project Accomplishment/Progress Report (to be accomplished by the project partner)

The project implementation shall start as soon as the project is approved and the first tranche is released to project proponent.

The approved budget is released through progress billing or in tranches, depending on the type of project and schedule of milestone as described in the approved project proposal and work and financial plan, and is subject to the existing accounting and auditing rules and regulations. There will be a 15% retention which will be released only upon certification of the project completion by the DARRO/RSSD and accepted/concurred with by the DAR Regional Executive Committee concerned.

The Project Progress Report (see Annex C) is a requirement before the release of the next tranche. It is the basic monitoring and reporting tool of each project. The report illustrates the implementation of the project and performance of the partner organization. It looks at key milestones and actions that are crucial to tracking DAR's effective contribution to the project and rural development in general.

The report should include discussion of objectives and the status of project implementation and describes the project activities by making a comparison between planned activities and actual activities, the identification of the problems met and the actions taken, the gains and benefits derived from the project with reference to the baseline data and the work plan for the succeeding tranche period. The accomplishment report likewise outlines the sustainability measures being put in place.

This report also contains the expenditures of project operations for the period covered as well as the cumulative expenditures and variance report on the utilization of DAR support as against the approved budget. Audited financial statements shall also be required. Therefore, the financial report also gives information such as, but not limited to, actual expenditures for the period as compared to the approved budget both for expenditures drawn from the DAR grant and those drawn from counterpart funds. These are supported by schedules of receipt, disbursement, and expenditures.    TDEASC

The DARPO and DARRO/RSSD shall evaluate the submitted Project Progress Report. Upon positive monitoring feedback from the DARPO and DARRO/RSSD, through the submission of the evaluation report and certification from the DARRO Execom endorsing the release, the SSO shall facilitate/process the release of next tranche. The percentage of fund releases is dependent upon the percentage of accomplishment and funds liquidation requirements. As a trigger for the next tranche release, the Project Progress Report should be submitted a month before the next tranche payment is due so that there would be no gap in the flow of funds needed by the project as reflected in the approved WFP.

D.        Monitoring and Evaluation and Financial Audits (involving both the project partners and the DAR)

Monitoring and evaluation are a continuing task of both the partner organization and DAR. Further site visits, project reviews and financial audits are undertaken all throughout the project duration. These ensure the high level quantitative and qualitative impacts on the ARBs and ARCs. Good project management and implementation is an essential ingredient for sustainability. It is important that the project partners, the DARPOs and the DARROs answer all the questions and forms to ensure that all pertinent data are put in place for the M & E.

E.         Project Completion (involving both the project partners and the DAR)

At the end of the project term, the project partner has to submit a Project Completion Report (PCR) covering both physical and financial aspects together with supporting documents/proof of evidence that the programmed activities were undertaken. The SSO shall evaluate and verify the PCR through the regional and provincial offices concerned. PCRs should be certified by the DARPO and endorsed by the DARRO Execom to SSO for final release of partnership support funds. The project accomplishments should include the impacts and significant changes brought about by the project in the lives of the individual men and women ARBs as well their households and the community.

VI.       Reporting System

Activities conducted, as stipulated in the time frame of the Project proposal should be captured as accomplishments, for the said reporting period, based on set Performance Indicators under the PBD-MFOs. Reporting of such shall follow the procedure as set forth under MC No. 17 series of 2010.

Outputs of the activities of projects in ARCs should be reflected in the quarterly/semestral and annual ARC Monitoring and Tracking System (ARCMTS), of the concerned DARMO/DARPO and DARRO.    ECSHID

VII.     Attachment Forms

1.         Annex A — DAR-SSO project proposal format;

2.         Annex B — DAR-SSO project proposal appraisal format;

3.         Annex C — DAR-SSO project report format; and,

4.         Annex D — PBD Programs (based on Memorandum 64 s. 2011)

5.         Annex E — Sample Log Frame

VIII.    Effectivity

This order supersedes any other issuances/guidelines inconsistent with it, and shall take effect immediately.

May 18, 2011, Diliman, Quezon City.

(SGD.) VIRGILIO R. DE LOS REYES
Secretary

ANNEX A

i Project Proposal Format

A.        Project Identifying Data

1.         Project Title

2.         Proponent Organization

3.         Project Location (specify barangays and state if ARC, ARC cluster or Non-ARC Barangay)

4.         Target Direct Beneficiaries

5.         Target ARBs/ARCs

6.         Target Number of Covered Agrarian Landholdings (in terms of land owners and hectarage of distributed lands)

7.         Proposed Beneficiary Organization (if different from proponent organization)    ICAcHE

8.         Project Duration

9.         Project Type According to the PBD Priorities

            (Please check where appropriate)

                   PBD Priority                                                                     Response

A.    Enterprise-Based Pilot Program Model:

        1.     Agricultural Productivity Development for existing and new ARBs/to be installed ARBs;

        2.     Agri-based Micro-Small and Medium Enterprise (MSME) Development;

        3.     Agri-based Industry Development (value-chain approach);

        4.     Value-chain Financing Development;

        5.     ARB Market Development;

        6.     Value-chain and Agri-business Capability Development for ARBs;

        7.     Enterprise-based capacity enhancement for PBD implementers; and

B.    Social, Health and Water and Sanitation Projects (e.g., CPWASH, DAR-AP, OSHWIND, etc.)

C.    Others (Please identify)

10.       Budget (if multi-year projects, breakdown budget by year in matrix form)

•           Amount Requested from DAR

•           Counterpart (at least 30% of the total cost of the project which may be in the form of labor, materials, equipment, land or facilities)

•           Proponent & Beneficiary Organization — at least 15% of the total project cost

•           Other Agencies/Groups — at least 15% of the total project cost

•           Total Project Budget

•           Cost Per Beneficiary (Total Budget Divided By Target Number of Direct Beneficiaries) 

B.        Proponent Organization Identifying Data

1.         Address

2.         Phone

3.         Fax

4.         Email

5.         Authorized Representative Contact Person

6.         Address of Representative

7.         Mobile No.

8.         Date Organized

9.         Date Registered

10.       Type of Registration and Registration Number

11.       Network Affiliation (if any)

12.       Previous Projects/Donors

13.       Financial Position (Copy of Audited Financial Statement Last 2 Years)

14.       Assessment of the Proponent's/Beneficiaries' Capability to Implement, Manage and Operate the Project (please include verification documents: similar projects: title, funding agency, duration/year completed)

C.        Beneficiary Organization Identifying Data

(If the proponent and beneficiary organizations are the same, just leave this portion blank.)

1.         Address

2.         Phone

3.         Fax

4.         Email

5.         Contact Persons/Key Leaders and Addresses

6.         Mobile No.

7.         Date Organized

8.         Date Registered and Registration Number

9.         No. of Members

10.       Type of Registration

11.       Network Affiliation (if any)

12.       Previous Projects/Donors

13.       Financial Position (Copy of Audited Financial Statement)

D.        Collaborating Organization Identifying Data

[In the case of more than one institution collaborating, details of the other collaborating institutions should be provided as follows]

1.         Address

2.         Phone and Fax

3.         Email

4.         Contact Persons/Key Leaders and Addresses

5.         Mobile No.

6.         Date Organized

7.         Date Registered and Registration Number

8.         No. of Members

9.         Type of Registration

10.       Network Affiliation (if any)

11.       Previous Projects/Donors

E.         Project Description

(The items in this section should establish a logical relationship and show how the project will be implemented, sufficient to justify the indicative time and budget requested. For multi-year projects, an annual breakdown of objectives/expected results should be presented, preferably in matrix form.)

1.         Describe the Project in 1-2 Sentences Only

2.         Project Background

            (Indicate the key factors affecting the realization of the development objectives being addressed by the project e.g., the existing situation in the area and the socio-economic conditions of the beneficiaries.)

3.         Project Rationale/Specific Problem Being Addressed

            (Explain why the project is needed and how the investment of the project's immediate objectives could be expected to assist in the realization of related development objectives. Include only the more immediate problems that the project will be able to address within the project duration.)

4.         Project Objectives

•           General Objectives

            (Define the broad development objectives addressed by the project. The statement may be quantitative or qualitative but should be explicit and precise.)

•           Specific Objectives

            (Indicate the immediate targets or objectives that the project itself is expected to achieve. Again, the statement may be quantitative or qualitative but should be specific as possible. If the project has several objectives, they should be stated in the order of importance.)

            The objectives may correspond to certain outcome indicators like jobs generated and sustained profitability of agribusiness endeavors of ARBs. Specifically, the objectives may include increased household income, increased crop yields, functional and sustained ARB organizations for support services delivery, and enhanced socio-economic condition of the gender-equitable ARB households and community)

5.         Expected Results

•           Impact on family income of beneficiaries and the immediate community

•           Expected benefits and contributions of the project to the development of the socio-economic conditions of the area e.g., employment generation, decrease in insurgency movements, increase in yields or production volume, etc.

•           Quantitative benefits to be derived from the project vis-à-vis project cost Economic Internal Rate of Return (EIRR) or Benefit-cost (B/C) ratios and Financial Internal Rate of Return (FIRR) for revenue

6.         Major Project Components

            (Identify the project components and the corresponding activities that will be done to achieve these objectives and expected results. Categorize a series/set of activities and the results into 1 project component such as social, technical, marketing aspects and other schemes or milestones)

7.         Project Innovation

            (Determine what makes this project different from others of the same nature. What innovation will the project introduce?)

8.         Contributions to the DARPO's Focus

9.         Contributions to DAR's LTI-PBD Objectives

10.       Role and Contribution of Other Agencies (CSUs, CIAs, etc.)

F.         Project Management

1.         Background/track record of the proponent relevant to the proposed project

2.         Assessment of the proponent's/beneficiaries' capability to implement, or manage and operate the project (cite relevant and similar experiences, manpower, financial resources)

3.         Describe the structure, composition and functions of the Project Implementing Team (PIT) which shall be responsible for the day-to-day operations of the project.

4.         Attach a resolution from the Board of Directors stating their endorsement and responsibility on the project

5.         Attach CVs of Key Staff to be assigned showing qualifications (education, experience)

G.        Financial and Economic Soundness

1.         Show the computation of the financial and other benefits of the project (expected income increases, capital build-up/savings, employment generated, etc., effects in terms of expansion of agricultural production or increase in productivity per hectare) in comparison to the present condition of the beneficiaries. 

2.         Attach a business plan showing analysis of profitability, liquidity, solvency (e.g., IRR, ROI, BCR), credit scheme, etc.

H.        Monitoring & Evaluation

1.         Describe the monitoring and evaluation system/process that will be used to monitor the progress of implementation and achievement of results. This will include outcome/output indicators, data gathering tools/techniques, frequency, etc. (Refer to Annex C. Project Progress Report in Coming Up with the Outcome/Output Indicators)

I.          Sustainability Mechanisms

1.         What organizational structure will sustain the project benefits after DAR assistance?

2.         Describe how this structure intends to sustain/continue the project benefits? (Should include practical steps or specific plans/mechanisms to ensure sustainability in terms of the human/financial resource, institutional or technical aspects of the project)

J.          Community Participation

1.         Prior to this proposal, was there any previous activity done by the proponent, together with the beneficiary organization?

2.         Specify the participation of beneficiaries in the project (attach a resolution as evidence) planning, implementation, management and contribution to costs.

3.         State whether the local government or other line agencies will be involved in the project implementation. In what way will they be involved (e.g., provision of cash or in-kind contribution, technical assistance.)?

4.         What specific concerns in the local development plan does the project respond?

K.        Promotion of Gender Equality

1.         What is the number and proportion of women and men among the target beneficiaries?

2.         Describe how men and women will share the responsibilities of and the benefits from the project.

3.         How will the projected outcomes result to gender-related changes such as access to and control of resources and benefits, division of workloads and time-use, etc.

L.         Promotion of Sound Environmental Practices and Risk Assessment

1.         What environmental concerns of the ARBs/ARCs have been identified?

2.         What effects (positive and negative) will the project have on the environment or on these environmental concerns?

3.         What measures will be employed by the project to minimize its negative effects on the environment?

4.         What other environment-related activities will the project engage in?

5.         What climate change adaptive tools and strategies will the project put in place?

6.         Identify the significant risks and common causes of failure in projects of this nature that will likely affect the achievement of project results. What is the likelihood of these occurring during the life of the project?

7.         What measures will be implemented to prevent or mitigate the identified risks?

M.        Funding Request

(Indicate the financial inputs/resources necessary to carry our project activities, and the extent of financial equity of the involved organization/institution, the beneficiary organization and the collaborating organization.) 

 

Major Budget

Deliverables/

Estimated

Contribution

Counterpart Contributions

Request

 

Line Items

specific

Total Cost

of Other

Proponent

Beneficiaries

from

 

 

outputs

 

Donors

 

 

DAR

 

(1)

(2)

(3)

(4)

(5)

(6)

(7)

 

_____________

___________

___________

___________

________

____________

_________

 

_____________

___________

___________

___________

________

____________

_________

 

_____________

___________

___________

___________

________

____________

_________

 

TOTALS

___________

___________

___________

________

____________

_________

Note: (1) Budget items should correspond to project components. Categorize into direct cost and admin cost. (2) specify outputs in terms of quantity and quality (e.g., 2 operational post harvest facilities established; 2 cooperatives operating palay trading business) (3) Sum total of columns (4) to (7); (4) Other donors can be LGUs, government line agencies, private sector or other for sources; (5) & (6) Cash and/or in-kind contribution e.g., labor: should indicate the assumptions or basis for the computation; and (7) amount requested from DAR

N.        Work Plan

Include the implementation schedule of major project activities as well as indication of the logic for the workplan sequencing. The status of pre-investment studies done, if any, should be stated.  

O.        Target Major Final Outputs (MFOs)

Indicate the target MFOs your project will respond to and write its corresponding quantity (physical targets).  

 

Major Final Outputs

Performance Indicator

Target

 

Programs/Activities/Projects (PAPs)

 

Accomplishment

 

 

 

 

 

MFO 3: Support Services Implemented,

 

 

 

Facilitated and Coordinated for Delivery

 

 

 

To Program Beneficiaries

 

 

 

 

 

 

 

Program Beneficiaries Development

 

 

 

(PBD)

 

 

 

 

 

 

 

A.  Support Services to ARBs

 

 

 

 

 

 

 

1.  Social Infrastructure and Local

 

 

 

    Capability Building (SILCAB)

 

 

 

 

 

 

 

a.  Gender-Responsive Capacity

No. of ARBs Trained

 

 

     Development of ARBs/ARB

No. of core management trained

 

 

     Organizations

 

 

 

 

 

 

 

     a.1  Enterprise-based Training

 

 

 

 

 

 

 

           Conduct of Training/capability

No. of Capacity/training need

 

 

           Need Assessment

assessment conducted

 

 

 

 

 

 

           Conduct of Training by type

No. of Batches

 

 

           (enterprise and organizational

No. of Pax

 

 

           management skills dev't;

 

 

 

           technical planning and

 

 

 

           management and instruments,

 

 

 

           project devt and management,

 

 

 

           agri-non-agri technology, etc.)

 

 

 

 

 

 

 

           Coaching/mentoring and

No. of Field exposures conducted

 

 

           experiential exercises for core

No. of on the job training of core

 

 

           management staff & ARB leaders

management staff conducted

 

 

 

 

 

 

2.  Sustainable Agribusiness and

 

 

 

     Rural Enterprise Development

 

 

 

    (SARED)

 

 

 

 

 

 

 

A.  Promotion of the development of new

No. of organizations managing

 

 

      agribusiness lands

enterprises

 

 

 

 

 

 

 

No. of hectares developed for

 


 


 

agribusiness/agricultural


 

 

 

productivity    ICAcTa

 

 

 

 

 

 

 

No. of Jobs generation out

 

 

 

of enterprises/agribusiness

 

 

 

operations

 

 

 

 

 

 

      a.1  Agri-business Plans

No. of agribusiness/enterprise

 

 

 

dev't. plans prepared

 

 

 

 

 

 

            a.1.1  Business Plans Preparation

No. of business planning

 

 

 

workshops conducted

 

 

 

 

 

 

 

No. of business plan write shops

 

 

 

conducted

 

 

 

 

 

 

 

No. of business proposals

 

 

 

packaged

 

 

 

 

 

 

B.  Development of gender responsive

 

 

 

      agri- and non-agri enterprises

 

 

 

 

 

 

 

      b.1  Development of new product/services

No. of products and services

 

 

 

developed

 

 

 

 

 

 

             b.1.1  product technology

No. of product hands-on

 

 

                      demonstration (recipe mastery

technology demonstration

 

 

                      include step by step procedure)

conducted

 

 

 

 

 

 

                      b.1.1.1 product testing for scaling

No. of product testing conducted

 

 

 

 

 

 

 

No. of product documentation

 

 

 

undertaken/conducted

 

 

 

 

 

 

             b.1.2. Product Enhancement for existing

 

 

 

                      products

 

 

 

 

 

 

 

                      b.1.2.1 Product assessment (trade

No. of product assessment

 

 

                      marking, product dressing, label

conducted

 

 

                      & packaging)

No. of supply chain inventory

 

 

 

conducted

 

 

 

 

 

 

                      b.1.2.2 Product standardization

No. of production system set-up

 

 

 

 

 


 


 

No. of laboratory test conducted


 

 

 

 

 

 

      b.2 Product commercialization

No. of products launched in

 

 

 

commercial markets

 

 

 

 

 

 

             b.2.1 Technical assistance in

No. of product registration for

 

 

                      complying the regulatory

food and non-food secured, from

 

 

                      requirements set by authorized

authorized agencies

 

 

                      agencies

 

 

 

 

 

 

 

 

No. of food processing plants

 

 

 

which have secured HACCP and

 

 

 

BFAD compliance certificates

 

 

 

 

 

 

 

No. of business permits and

 

 

 

license to operate facilitated

 

 

 

 

 

 

 

No. of production

 

 

 

facilities/processing plant

 

 

 

constructed

 

 

 

 

 

 

 

No. of production

 

 

 

facilities/processing plant

 

 

 

renovated

 

 

 

 

 

 

C.  Provision of marketing assistance

No. of marketing contracts

 

 

 

facilitated with agribusiness

 

 

 

buyers

 

 

 

 

 

 

 

Amount involved in facilitated

 

 

 

marketing contracts

 

 

 

 

 

 

 

No. of organizations involved

 

 

 

 

 

 

 

No. of marketing center

 

 

 

established

 

 

 

 

 

 

      c.1  Establish relationships with market

No. of market opportunities

 

 

             actors

evaluated

 

 

 

 

 

 

 

No. of non-traditional farm

 

 

 

activities that could offer

 

 

 

employment opportunities

 

 

 

evaluated

 


 


 


 


 

 

 

No. of meetings with potential

 

 

 

market outlets

 

 

 

 

 

 

      c.2  Market analysis

No. of market/buyers identified

 

 

 

 

 

 

             Identification of a basket of 

No. of market outlets/buyers

 

 

             opportunities that respond to the

directory provided to ARB-

 

 

             market demand and can be

producers

 

 

             produced under existing

 

 

 

             biophysical conditions and are of

 

 

 

             interested to the local producers

 

 

 

 

 

 

 

      c.3  Market negotiations

No. of negotiations meeting

 

 

 

between buyer and producers

 

 

 

conducted

 

 

 

 

 

 

 

No. of market forum

 

 

 

facilitated/conducted

 

 

 

 

 

 

 

No. of marketing

 

 

 

contract/agreements reviewed

 

 

 

 

 

 

D.  Provision of Gender Responsive

 

 

 

      Socialized Credit/Microfinance

 

 

 

      Assistance

 

 

 

 

 

 

 

      D.1  Access to Credit

No. of organizations provided

 

 

 

with access to credit

 

 

 

 

 

 

 

No. of ARBs involved

 

 

 

 

 

 

 

Amount of Loan availed

 

 

 

 

 

 

             D.1.1  Facilitate organization in

No. of orientation on available

 

 

                       accessing credit from LBP, and

credit windows conducted

 

 

                       other financial institutions

No. of credit/project proposals

 

 

 

prepared    EDISTc

 

 

 

 

 

 

             D.1.2  Assess the readiness of 

No. of credit eligibility assessment

 

 

                       organization in accessing credit

conducted

 

 

                       based on the eligibility requirement

No. of meetings conducted

 

 

                       set by the identified financial

 

 

 

                       institution

 

 

Certification:

Certified Correct: _____________________________________________
                             Name & Signature of Partner Authorized Representative

                             _____________________________________________
                             Date

Attested by:          _____________________________________________
                             Name & Signature of Partner Organization's BOD

                             _____________________________________________
                             Date

ANNEX B

i Desk Appraisal for DAR. Project Proposals

Project Number and Title:

Location of Project:

Proponent:

Note: 1.  This is not an approval document as the approval shall be made by the USEC SSO.

         2.   DAR Evaluating officer should ensure that the information and documents required have been completed.

Scoring Parameters: (Very Good = 3, Good = 2, Fair = 1, Unsatisfactory = 0)  

 

Criteria

Score

Comments/Issues

 

Consistency w/ DAR PBD Priorities &

 

 

 

DARPO Plans agreed upon during the

 

 

 

Provincial Plan Presentations

________

____________________

 

Organizational Capacity & Project

 

 

 

Management

________

____________________

 

Project Description & Clear Project

 

 

 

Objectives, Strategies, Impact

________

____________________

 

Financial & Economic Soundness

________

____________________

 

M&E Mechanisms

________

____________________

 

Community Participation and

 

 

 

Empowerment

________

____________________

 

Gender Responsiveness

________

____________________

 

Environmental Soundness and Risk

 

 

 

Assessment

________

____________________

 

Sustainability

________

____________________

 

TOTAL

________

____________________

Scores shall be tallied and proposals shall be classified as:

A = Ready for site appraisal = 22 to 27 points

B = For further development = 15 to 21 points

C = Not a priority = 8 to 14 points

D = Reject = 0 to 7 points

Additional Comments:

Appraisal Officer/Date:                                           Reviewed by:

_________________________

Action to be taken or Next Steps:

Checklist of Issues for Consideration in Project Appraisal of DAR Project Proposals

 

Criteria

 

Indicators

Means to Verify

 

Sufficiency of

[ ]

Proponent has provided complete

 

 

Information &

 

documentation requirements

 

 

Documents

 

 

 

 

Required

 

 

 

 

 

 

 

 

 

Consistency w/

[ ]

Objectives, sector, theme,

Proposal (problem statement,

 

DAR

 

and location relate to the

objectives/targets set,

 

Priorities &

 

DAR LTI & PBD

strategies/approaches/services/

 

DARPO Focus

 

priorities and DARPO

inputs to be delivered) — to be

 

 

 

focus

validated in field appraisal

 

 

 

 

 

 

Organizational

[ ]

Has implemented at least

Organizational Profile (part of the

 

Capacity &

 

two (2) projects, some of

proposal) — To be validated

 

Project

 

which are similar to the

through network contacts

 

Management

 

proposal

 

 

 

 

 

 

 

 

[ ]

Key leaders of the

CVs of the key leaders — To be

 

 

 

proponent have track

validated through network contacts

 

 

 

record in development

 

 

 

 

 

 

 

 

[ ]

Has performed well in

To be validated through network

 

 

 

previous projects (if any)

contacts

 

 

 

 

 

 

 

[ ]

Net financial position

Audited Financial Statements

 

 

 

indicates stability &

 

 

 

 

adequate resources to

 

 

 

 

provide counterpart for the

 

 

 

 

project

 

 

 

 

 

 

 

 

[ ]

Is a member of a credible

Organizational Profile — To be

 

 

 

network

validated through network contacts

 

 

 

 

 

 

Project

[ ]

Problem to be addressed is

 

 

Description &

 

identified

 

 

Clear Project

[ ]

Project is clear on what to

 

 

Objectives,

 

do and how to do it

Proposal (problem statement, project

 

Strategies,

[ ]

Objectives are clear,

description, objectives/targets set,

 

Impact

 

measurable, and feasible

strategies/approaches/services/

 

 

 

when measured against

inputs to be delivered) — to be

 

 

 

resources to be provided

validated in field appraisal

 

 

 

and project timeframe

 

 

 

 

 

 

 

 

[ ]

Technology is tested and

 

 

 

 

locally available

 

 

 

 

 

 

 

 

[ ]

Objectives and strategies

 

 

 

 

are consistent with the

 

 

 

 

problem and project

 

 

 

 

 

 

 

 

[ ]

Project builds on previous

 

 

 

 

achievement

 

 

 

[ ]

Project will enhance the

Proposal (strategies/approaches/

 

Financial and

 

beneficiaries' productivity

services/inputs to be delivered) — to

 

Economic

 

and can enhance access of

be validated in field appraisal

 

Soundness

 

beneficiaries to economic

 

 

 

 

resources

 

 

 

 

 

 

 

 

[ ]

Financial assumptions in

Budget estimates, Business Plan,

 

 

 

terms of budget estimates

Project Cash Flow as compared with

 

 

 

and project economic

Standard cost parameters/industry

 

 

 

returns (for income-

rates/prevailing unit costs in the area

 

 

 

generating projects) are

 

 

 

 

stated and realistic; costs

 

 

 

 

are reasonable

 

 

 

 

 

 

 

 

[ ]

Benefits will be worth the

Proposal (objectives/targeted

 

 

 

cost by project end

outcomes/project cost) as

 

 

 

 

compared with benchmarks/cost

 

 

 

 

parameters per ARB/net present value

 

 

 

 

(NPV), EIRR

 

 

 

 

 

 

 

[ ]

Financial projections

Business Plan/Projected Cash Flow

 

 

 

indicate long-term

 

 

 

 

sustainability at the

Use cost and return analysis per

 

 

 

beneficiaries' level

hectare/unit; verify assumptions used

 

 

 

 

for unit costs, prices of commodities,

 

 

 

 

projected yields in comparison the

 

 

 

 

existing levels

 

 

 

 

 

 

 

 

 

Calculate Financial Internal Rate of

 

 

 

 

Return

 

 

 

 

 

 

 

[ ]

For micro-enterprise

Business Plan/Projected Cash

 

 

 

projects, will generate

Flow/Market study

 

 

 

income that will sustain

 

 

 

 

operations; market is

Verify and compare with prevailing

 

 

 

defined

values the unit costs, prices and yield

 

 

 

 

assumptions used by the proponent

 

 

 

 

 

 

 

 

 

Evidence may be a letter of Intent

 

 

 

 

between the proponent and private

 

 

 

 

partner to enter into marketing or

 

 

 

 

contract growing agreements

 

 

 

 

 

 

 

[ ]

Administrative cost do not

Budget Estimates

 

 

 

exceed 25% of the DAR

 

 

 

 

grant requested nor

Cross check with eligible items for

 

 

 

estimated total project cost

funding support by DAR (like, office

 

 

 

 

rental, vehicles, may not be eligible

 

 

 

 

items)

 

 

 

 

 

 

 

[ ]

At least 25% of the total

Budget Estimates

 

 

 

project cost will be the

 

 

 

 

counterpart of the

 

 

 

 

proponent while others

 

 

 

 

will be supported by other

 

 

 

 

sources, e.g., LGUs/Private

 

 

 

 

sector

 

 

 

 

 

 

 

 

[ ]

Environmental concerns of

Proposal (strategies) — to be

 

Promotion of

 

the ARBs/ARCs are

validated in field appraisal

 

sound

 

identified

 

 

environmental

[ ]

Possible environmental

Proposal (strategies) — to be

 

practices,

 

effects (positive and

validated in field appraisal

 

Climate change

 

negative) of the project are

 

 

adaptation and

 

identified

 

 

Risk

[ ]

Mitigating measures have

Proposal (strategies) — to be

 

Management

 

been designed to minimize

validated in field appraisal

 

 

 

and/or eliminate negative

 

 

 

 

effects

 

 

 

 

 

 

 

 

[ ]

Involves environment-

Proposal (strategies)

 

 

 

related activities

 

 

 

 

 

 

 

 

[ ]

Climate Change Adaptive

Proposal (strategies) — to be

 

 

 

Tools & Strategies in place

validated in field appraisal

 

 

 

 

 

 

 

[ ]

Potential risks are

Proposal (strategies) — to be

 

 

 

identified

validated in field appraisal

 

 

 

 

 

 

 

[ ]

Mitigating measures have

Proposal (strategies) — to be

 

 

 

been designed to minimize

validated in field appraisal

 

 

 

and/or eliminate the

 

 

 

 

identified risks

 

 

 

 

 

 

 

 

[ ]

Monitoring & evaluation

 

 

M & E

 

systems are in place

Proposal (Statement of Problem) — to

 

 

[ ]

Baseline indicators and

be validated through secondary data

 

 

 

recorded

and field appraisal

 

 

 

 

 

 

 

[ ]

Training inputs and skills

Proposal (training plan/agenda) — to

 

 

 

to be acquired for target

be validated in field appraisal

 

Community

 

ARBs/ARCs beneficiaries

 

 

Participation

 

and leaders are specified

 

 

and

[ ]

ARBs/ARCs are

Proposal (background on partner

 

Empowerment

 

organized and were

organization) — to be validated in

 

 

 

involved in problem

field appraisal; community or group

 

 

 

identification and project

resolution or manifesto of support

 

 

 

design

 

 

 

 

 

 

 

 

[ ]

ARBs/ARCs will be

Proposal (organizational

 

 

 

involved in project policy-

arrangements) — to be validated in

 

 

 

making and management

field appraisal

 

 

 

 

 

 

 

[ ]

Concerned local

Proposal (organizational

 

 

 

government units have

arrangements) — to be validated in

 

 

 

been consulted on and are

field appraisal; with letter of support

 

 

 

supportive of the project

from the LGU or an SB resolution, if

 

 

 

 

necessary

 

 

[ ]

ARBs/ARCs and LGUs

Matrix of Financial Requirements and

 

 

 

and Private sector are

Sources

 

 

 

willing to provide equity

 

 

 

 

contribution to the project

Proof of Availability of Equity such as

 

 

 

resource requirements

resolution, letter of intent, or in the

 

 

 

 

case of LGUs, the Local Finance

 

 

 

 

Committee Certification of funds

 

 

 

 

availability, whichever is necessary

 

 

 

 

 

 

 

[ ]

Provides gender-

Proposal (statement of problem,

 

Gender

 

disaggregated data used in

performance indicators)

 

Responsiveness

 

planning and for

 

 

 

 

monitoring and evaluation

 

 

 

 

 

 

 

 

[ ]

There is equitable

Proposal (strategies) — to be

 

 

 

participation of women

validated in field appraisal

 

 

 

and men in project

 

 

 

 

activities, decision-

 

 

 

 

making, access and control

 

 

 

 

of resources and benefits

 

 

 

 

 

 

 

 

[ ]

Possible inimical effects of

 

 

 

 

this project on women are

Proposal (strategies) — to be

 

 

 

identified and mitigating

validated in field appraisal

 

 

 

measures are planned

 

 

 

 

 

 

 

 

[ ]

Project opened new roles

 

 

 

 

and opportunities for

 

 

 

 

women and men

 

 

 

 

 

 

 

 

[ ]

Project will establish or

 

 

 

 

work with and through

Proposal (strategies) — to be

 

Sustainability

 

structures that will ensure

validated in field appraisal and

 

 

 

sustainability

through secondary data sources

 

 

 

 

 

 

 

[ ]

Conditions required for the

 

 

 

 

project to succeed and be

 

 

 

 

sustained are identified

 

 

 

 

and addressed

 

 

 

 

 

 

 

 

[ ]

Clear sustainability and

 

 

 

 

funding phase-out

 

 

 

 

structures and mechanisms

 

 

 

 

are in place

 

 ANNEX C

Project Progress Report No. ____  

Project Number _____

Title of Project              _________________________________________________

Partner Organization    _________________________________________________

Status as of                   _________________________________________________

Date Started                 ___________ Grant Amount Approved _________________

Grant Amount So Far                            Grant Amount Requested
Released                       ___________    for the Next Tranche      _________________

Target Project End Date: ____________________

Objectives 

 

As Designed

Level of Attainment

 

 

 

 

Enumerate objectives as indicated in

Per objective, describe the extent to which

 

the approved Project Document

the objectives have been achieved by the

 

 

project

Outcomes 

 

As Designed

Level of Attainment

 

 

 

 

Enumerate expected outcomes as

Per outcome, describe the extent to

 

indicated in the approved

which such outcomes have been achieved

 

Project Document

by the project

Contribution to DAR LTI & PBD Priorities

Describe how this project has contributed to your targeted PBD priorities and DARPO Plans 

                     PBD Priority                                  Project's Contribution

A.    Enterprise-Based Pilot Program Model:

        1.   Agricultural Productivity Development
              for existing and new ARBs/to be
              installed ARBs;

        2.   Agri-based Micro-Small and Medium
              Enterprise (MSME) Development;

        3.   Agri-based Industry Development
              (value-chain approach);

        4.   Value-chain Financing Development;

        5.   ARB Market Development;

        6.   ARB Market Development;

        7.   Value-chain and Agri-business Capability
              Development for ARBs;

        8.   Enterprise-based capacity enhancement
              for PBD implementers; and

B.    Social, Health and Water and Sanitation
        Projects (e.g., CPWASH, DAR-AP,
        OSHWIND, etc.)

C.    Others (Please identify)

Contribution to Provincial Development Plan

Describe how the project has contributed to the Provincial Development Plan.

Performance as of the period as per signed contract (Use separate sheet using the format below) 

Elapsed time: ____ (no. of months since start date/total number of months within contract period) 

 

Payment

Deliverables

Actual funds

Physical

Weighted

Variance

Explanation

Action

Milestone

 

schedule

(per approved

released/

accomplishment

physical

 

of

Relating

target for

 

(per

proposal,

% disbursed

(%)

accomplishment

 

Variance

to

Next

 

approved

WFP or

 

 

 

 

 

Variance

Period as

 

proposal

MOA)

 

 

 

 

 

 

specified

 

or work or

 

 

 

 

 

 

 

in project

 

financial

 

 

 

 

 

 

 

contract,

 

plan or

 

 

 

 

 

 

 

including

 

MOA)

 

 

 

 

 

 

 

the

 

 

 

 

 

 

 

 

 

Variance

 

P300,000

 

P300,000

100%

20%

 

 

 

 

 

(20%)

 

20%

 

 

 

 

 

 

 

 

CDA

 

100%

 

 

 

 

 

 

 

Certificate of

 

 

 

 

 

 

 

 

 

registration

 

 

 

 

 

 

 

 

 

for 5

 

 

 

 

 

 

 

 

 

cooperatives

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5 coops with

 

 

 

 

 

 

 

 

 

PSP on

 

 

 

 

 

 

 

 

 

microfinance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(E.g., To

 

 

 

 

 

 

 

 

 

be

 

 

 

 

 

 

 

 

 

accomplished

 

 

 

 

 

 

 

 

 

in the next

 

 

 

 

 

 

 

 

 

milestone

 

 

 

 

 

 

 

 

 

period.

 

 

 

 

 

Overall

 

 

 

 

 

 

 

 

 

physical

 

 

 

 

 

 

 

 

 

accomplishment

 

 

 

 

 

 

  Other Activities

Enumerate activities undertaken that were not mentioned in the Project Workplan but were undertaken to achieve project objectives. Explain how such activity(ies) contributed to the accomplishment of expected outcomes. 

Issues and Concerns

Relate here the problems encountered that have affected the achievement of project outcomes and objectives. How were these addressed and what were the corresponding outcomes?

Actions Required and Recommendations

Specify or define the actions needed or recommended measures to solve the issues and concerns and which office should do these.    AHDaE 

Sustainability

What mechanisms and organizational arrangements are being established to sustain the project and its benefits after DAR assistance? Describe the specific measures to ensure sustainability in terms of the human/financial resource, institutional or technical aspects. Are there functional and sustained ARB/ARC organizations for support services delivery? 

Impact on the ARBs/ARCs

How has the socio-economic condition of the ARB households been affected? What positive effects, if any, is the project contributing to increased household incomes? Increased crop yields? Job generation? How is the project ensuring the sustained profitability of the agribusiness endeavors of the ARBs? 

Impact on Gender and Development

In a sex-disaggregated manner, describe here the beneficiaries and stakeholders at the community and institutional level, and their specific participation and share in the benefits of the project. How has the project been affecting gender roles and relations on the household, organizational and community level?    DcHSEa

 Impact on the Environment

What positive effects, if any, is the project contributing to the environment? What negative effects, if any, has this project been bringing, wittingly or unwittingly to the environment? What is being done about it? 

Most Significant Change Stories 

What are the three most significant changes that took place in the lives of three direct project beneficiaries as a result of this project? Mention in the narrative: who told the story (the beneficiary who told the story)? when did it happen? who was/were involved? what happened? why is this change significant? 

Most Significant Development Risks

What were the three most significant factors/events that have adversely affected the project? Mention in the narrative: who told the story (the Project Implementing Team member who told the story)? when did it happen? who was/were involved? what happened? why is this factor significant? 

Promotional Activities

Describe what promotional activities were conducted to promote the project and inform the general public. Also state what form of medium was used (i.e., signage, flyers, leaflets, other print media, radio, television). If print media, flyers or leaflet was utilized, submit to DAR-SSO/ DARPO a copy of the clipping, the flyer or the leaflet. 

Financial Reports 

See Expenditure Report format 

Accomplishment as per Major Final Outputs

Indicate the MFOs your project finished and write their corresponding quantity (physical targets). 

 

Major Final Outputs

Performance Indicator

Target

 

Programs/Activities/Projects (PAPs)

 

Accomplishment

 

 

 

 

 

MFO 3: Support Services Implemented,

 

 

 

Facilitated and Coordinated for Delivery

 

 

 

To Program Beneficiaries

 

 

 

 

 

 

 

Program Beneficiaries Development

 

 

 

(PBD)

 

 

 

 

 

 

 

A.  Support Services to ARBs

 

 

 

 

 

 

 

1.  Social Infrastructure and Local

 

 

 

    Capability Building (SILCAB)

 

 

 

 

 

 

 

a.  Gender-Responsive Capacity

No. of ARBs Trained

 

 

     Development of ARBs/ARB

No. of core management trained

 

 

     Organizations

 

 

 

 

 

 

 

     a.1  Enterprise-based Training

 

 

 

 

 

 

 

           Conduct of Training/capability

No. of Capacity/training need

 

 

           Need Assessment

assessment conducted

 

 

 

 

 

 

           Conduct of Training by type

No. of Batches

 

 

           (enterprise and organizational

No. of Pax

 

 

           management skills dev't;

 

 

 

           technical planning and

 

 

 

           management and instruments,

 

 

 

           project devt and management,

 

 

 

           agri-non-agri technology, etc.)

 

 

 

 

 

 

 

           Coaching/mentoring and

No. of Field exposures conducted

 

 

           experiential exercises for core

No. of on the job training of core

 

 

           management staff & ARB leaders

management staff conducted

 

 

 

 

 

 

2.  Sustainable Agribusiness and

 

 

 

     Rural Enterprise Development

 

 

 

    (SARED)

 

 

 

 

 

 

 

A.  Promotion of the development of new

No. of organizations managing

 

 

      agribusiness lands

enterprises

 

 

 

 

 

 

 

No. of hectares developed for

 


 


 

agribusiness/agricultural


 

 

 

productivity    ICAcTa

 

 

 

 

 

 

 

No. of Jobs generation out

 

 

 

of enterprises/agribusiness

 

 

 

operations

 

 

 

 

 

 

      a.1  Agri-business Plans

No. of agribusiness/enterprise

 

 

 

dev't. plans prepared

 

 

 

 

 

 

            a.1.1  Business Plans Preparation

No. of business planning

 

 

 

workshops conducted

 

 

 

 

 

 

 

No. of business plan write shops

 

 

 

conducted

 

 

 

 

 

 

 

No. of business proposals

 

 

 

packaged

 

 

 

 

 

 

B.  Development of gender responsive

 

 

 

      agri- and non-agri enterprises

 

 

 

 

 

 

 

      b.1  Development of new product/services

No. of products and services

 

 

 

developed

 

 

 

 

 

 

             b.1.1  product technology

No. of product hands-on

 

 

                      demonstration (recipe mastery

technology demonstration

 

 

                      include step by step procedure)

conducted

 

 

 

 

 

 

                      b.1.1.1 product testing for scaling

No. of product testing conducted

 

 

 

 

 

 

 

No. of product documentation

 

 

 

undertaken/conducted

 

 

 

 

 

 

             b.1.2. Product Enhancement for existing

 

 

 

                      products

 

 

 

 

 

 

 

                      b.1.2.1 Product assessment (trade

No. of product assessment

 

 

                      marking, product dressing, label

conducted

 

 

                      & packaging)

No. of supply chain inventory

 

 

 

conducted

 

 

 

 

 

 

                      b.1.2.2 Product standardization

No. of production system set-up

 

 

 

 

 


 


 

No. of laboratory test conducted


 

 

 

 

 

 

      b.2 Product commercialization

No. of products launched in

 

 

 

commercial markets

 

 

 

 

 

 

             b.2.1 Technical assistance in

No. of product registration for

 

 

                      complying the regulatory

food and non-food secured, from

 

 

                      requirements set by authorized

authorized agencies

 

 

                      agencies

 

 

 

 

 

 

 

 

No. of food processing plants

 

 

 

which have secured HACCP and

 

 

 

BFAD compliance certificates

 

 

 

 

 

 

 

No. of business permits and

 

 

 

license to operate facilitated

 

 

 

 

 

 

 

No. of production

 

 

 

facilities/processing plant

 

 

 

constructed

 

 

 

 

 

 

 

No. of production

 

 

 

facilities/processing plant

 

 

 

renovated

 

 

 

 

 

 

C.  Provision of marketing assistance

No. of marketing contracts

 

 

 

facilitated with agribusiness

 

 

 

buyers

 

 

 

 

 

 

 

Amount involved in facilitated

 

 

 

marketing contracts

 

 

 

 

 

 

 

No. of organizations involved

 

 

 

 

 

 

 

No. of marketing center

 

 

 

established

 

 

 

 

 

 

      c.1  Establish relationships with market

No. of market opportunities

 

 

             actors

evaluated

 

 

 

 

 

 

 

No. of non-traditional farm

 

 

 

activities that could offer

 

 

 

employment opportunities

 

 

 

evaluated

 


 


 


 


 

 

 

No. of meetings with potential

 

 

 

market outlets

 

 

 

 

 

 

      c.2  Market analysis

No. of market/buyers identified

 

 

 

 

 

 

             Identification of a basket of 

No. of market outlets/buyers

 

 

             opportunities that respond to the

directory provided to ARB-

 

 

             market demand and can be

producers

 

 

             produced under existing

 

 

 

             biophysical conditions and are of

 

 

 

             interested to the local producers

 

 

 

 

 

 

 

      c.3  Market negotiations

No. of negotiations meeting

 

 

 

between buyer and producers

 

 

 

conducted

 

 

 

 

 

 

 

No. of market forum

 

 

 

facilitated/conducted

 

 

 

 

 

 

 

No. of marketing

 

 

 

contract/agreements reviewed

 

 

 

 

 

 

D.  Provision of Gender Responsive

 

 

 

      Socialized Credit/Microfinance

 

 

 

      Assistance

 

 

 

 

 

 

 

      D.1  Access to Credit

No. of organizations provided

 

 

 

with access to credit

 

 

 

 

 

 

 

No. of ARBs involved

 

 

 

 

 

 

 

Amount of Loan availed

 

 

 

 

 

 

             D.1.1  Facilitate organization in

No. of orientation on available

 

 

                       accessing credit from LBP, and

credit windows conducted

 

 

                       other financial institutions

No. of credit/project proposals

 

 

 

prepared    EDISTc

 

 

 

 

 

 

             D.1.2  Assess the readiness of 

No. of credit eligibility assessment

 

 

                       organization in accessing credit

conducted

 

 

                       based on the eligibility requirement

No. of meetings conducted

 

 

                       set by the identified financial

 

 

 

                       institution

 

 

Feedback:

Certified Correct: __________________________________________________
                             Name & Signature of Partner Authorized Representative/Date

Attested by:          __________________________________________________

                             i Name & Signature of Partner Organization's BOD/Date 

i ANNEX D

DAR PBD Programs
CY 2011-2014

Definition, Description and Suggested Type of Projects Eligible for PBD Funding: 

1.         Agricultural Productivity Development Program for Existing and New ARBs/to be installed ARBs in ARCs and non-ARCs.

•           Includes programs/projects to build-up/expand/increase agricultural productivity of the lands awarded to existing and new ARBs and those that were previously awarded to newly-installed ARBs.

•           Projects may include (a) tapping resources for agricultural inputs, i.e., fertilizers, seeds, etc.; (b) Capacity development for agricultural production based on crops; (c) Technology trainings on Sustainable Agriculture, Good Agricultural Practices/GAP; (d) farm diversification; (e) agro-forestry, among others.    

2.         Micro, Small and Medium Enterprises (MSME) Development Program

•           Includes livelihood projects (farm, non-farm and off-farm) for ARBs and their households, ARBOs and ARB Cooperatives, such as:

—         Backyard poultry and livestock development, sari-sari store, etc.

          Small or medium scale processing, i.e., village-level processing of food and non-food products; organic fertilizer production

•           May include capability development programs/projects on:

          Development/improvement of ARBs' micro and small enterprises (MSEs);

          Livelihood Development for ARBs and their HHs;

          Development of ARB organizations enterprises (from micro/small to medium);

•           Also includes ARB cooperatives' enterprise projects with MFIs (such as CARD, NATCCO), retail organizations such as Hapinoy, Business Development Service Providers, rural financing institutions, rural banks.

•           Product development, packaging and labelling. 

3.         Agri-based Industry Development Program

•           Includes programs and projects for the full development of crops and commodities in the area, such as:

          Organic Rice consolidation/development;

          Support to Coco-Sugar integration/consolidation;

          Muscovado Sugar Development;

          High-valued crops and plantation crops (rubber, oil palm, cassava, banana, corn, etc.)

•           Medium-scale processing projects, such as VCO, Sunflower seeds, development of by-products from Lemon-Grass, etc. may also fall under this category.    aTc

•           DAR activities for ARBs within convergence projects of DAR-DA-DENR.

•           May also include capacity building for industry development or capacity development for all levels of the value-chain (production, processing and marketing) 

4.         Value-Chain Financing Program

•           Programs/projects that involves capacity development for local financing institutions to infuse capital, funding or resources to any part of the value-chain, in whole or a specific (e.g., coops, MFIs) segment of it.

          Financing the land preparation of ARBs' landholdings; funding the development/enhancement of ARB products/launching into commercial markets; construction/acquisition of post-harvest facilities, trucking etc.; financing on marketing such as trading.

•           Conduct of studies/research on value-chain may also be included.

•           Provision of capacity development for MFIs as credit intermediary. 

5.         ARB Market Development Program

•           Programs and projects that would facilitate ARBs' access to market, knowledge on the demand-side of the ARB products/services or linking the ARB products/services to actual markets.

•           Proposed projects may include market linkage to Jollibee, Chichacorn, or to a mango, banana or other high value crop exporter.

•           Projects may also be on the conduct of market research, market study or sub-sector study (knowing the demand for the products and knowing the business' competitor), participation to trade fairs. 

6.         Value-Chain and Agri-Business Capability Development Program for ARBs

•           Training programs designed to improve/upgrade the knowledge and capability of ARBs on the different aspects/segment of value-chain (production, processing and marketing) of prevailing crops and agri-business potentials in the area. The latter may be undertaken under the auspices of the NCI focus of developing agri-business lands.    

7.         Enterprise-Based Capacity Enhancement Program for PBD Implementers

•           Training programs designed to improve/upgrade the knowledge and capability of PBD implementers on development of enterprises (MSMEs) to ensure knowledge transfer to the ARBs through mentoring, coaching, etc. PBD implementers may include concerned DAR field personnel, other line agency personnel involve in program implementation, LGU, program stakeholders, etc. 

8.         Social, Health and Sanitation Projects

•           These include expansion/replication of CPWASH, OSHWIND, DAR-AP, among others.    ESTcIA 

ANNEX E 

PRIME Hierarchy of Results 

 

CARAGA Seaweed Project Sample Logframe


Footnotes

    1.       "Soft" projects refers to non-physical infrastructure projects.  

ANNEXES

  i         Attachment to MC ____ Series of 2011 entitled "Implementing Guidelines to Access Funds, Implement and Monitor Projects under the DAR-PBD Partnership Support Fund".



CONTACT INFORMATION

Department of Agrarian Reform
Elliptical Road, Diliman
Quezon City, Philippines
Tel. No.: (632) 928-7031 to 39

Copyright Information

All material contained in this site is copyrighted by the Department of Agrarian Reform unless otherwise specified. For the purposes of this demo, information are intended to show a representative example of a live site. All images and materials are the copyright of their respective owners.